Department Of Water Management Announces Funding For Lead Pipe Replacement

The City of Chicago has announced a new loan from the Environmental Protection Agency (EPA) for the replacement of lead pipes across the city. The loan is a continuation of an ongoing effort to replace a majority of the city’s pipes built before 1986, which have a high likelihood of being lead within smaller buildings. The work will be led by the Department of Water Management with the loan being finalized this past Friday.

Read More


Ramova Theater at 3518 S Halsted Street. Rendering by O'Riley Office

New Renderings Revealed For Ramova Theater Redevelopment

New renderings and details have been revealed for the nearly complete redevelopment of the Ramova Theater at 3518 S Halsted Street in Bridgeport. Located just south of the intersection with W 35th Street, plans for its remodel have been in the works for over four years and broke ground back in 2021. The development is being led by Baum Revisions, who is also working on the Congress Theater, and Our Revival Chicago.

Read More

3615 North Wilton Avenue

Construction Wraps Up for 3615 N Wilton Avenue in Lake View

Construction is wrapping up for a renovation and addition at 3615 North Wilton Avenue in Lake View. The project involves converting the existing residential structure, which previously comprised three residential units, into a five-unit edifice. This expansion includes creating a new residence in the basement and another with the construction of an additional floor, bringing the final height to four stories. The plans feature a rooftop deck, a north-facing metal porch, and a three-vehicle garage with a rooftop terrace.

Read More

Site of 3742 South Doctor Martin Luther King Junior Drive, via Google Maps

Construction Permit Issued for Multifamily Project at 3742 S Dr. Martin Luther King Jr. Drive in Park Boulevard

The City of Chicago has issued a construction permit for a residential building at 3742 S Dr. Martin Luther King Jr. Drive in Park Boulevard. Canaryville Homes LLC will oversee the development of the property, which is slated to house a three-story, two-unit residence with additional amenities. The permit forecasts a project completion date of November 3, 2023.

Read More