3001 W Cermak Road

New Permit Issued for 3001 W Cermak Road in South Lawndale

A new permit was issued yesterday for a new four-story mixed-use building at 3001 W Cermak Road in the South Lawndale neighborhood. Paul Tsakiris is listed as the permit owner and plans indicate this project will yield a total of six dwelling units and two commercial spaces. Plans indicate the presence of an elevator and a nine-car attached garage on the first floor. The development site is currently used for parking.

Read More

Fern Hill Development Shrinks In Old Town

A major change to the upcoming Old Town redevelopment of multiple lots has been confirmed by the second ward’s Alderman. The massive project being led by local developer Fern Hill was announced late last year with plans to construct various new structures across six parcels around the intersection of W North Avenue and N LaSalle Drive. The sites owned between Fern Hill and Moody Church will be replaced or added to prolific architect David Adjaye whose work includes the National Museum of African American History in Washington DC.

Read More

UIC Computer Design Research and Learning Center

Foundation Work Continues for New Computer Science Center at UIC Campus in Little Italy

Recent photos show structural work now rising above grade for University of Illinois Chicago‘s planned five-story computer science wing, known as the Computer Design Research And Learning Center. With work having commenced this past summer, the structure is set to replace a former parking lot at Little Italy‘s 900 W Taylor Street. This curvy addition will attach directly to the existing UIC Science and Engineering Labs building, while offering more than 135,00 square of new programming.

Read More

2915 Princeton Avenue

New Permits Issued for 2915 Princeton Avenue in Armour Square

Permits were issued yesterday for a new two-story residential building located at 2915 Princeton Avenue in the Armour Square neighborhood. Victor Kuo, of Kuo Construction, Inc, is listed as the permit owner. Plans indicate that the scope of the project will include a two-flat construction with a basement level. There will also be three on-grade parking spaces. The current structure has been scheduled for demolition.

Read More