Building Type


Aerial View of 150 E Ontario Street. Rendering by Lucien LaGrange Studio

Foundation Work Gives Way to Vertical Construction at 150 E Ontario Street in Streeterville

Taking ninth place in our year-end construction countdown, the 28-story hotel at 150 E Ontario Street is gearing up to rise in Streeterville. Developed by The Prime Group, the 345-foot-tall project will be the next location for the Spanish hotel brand RIU Hotels and Resorts, offering a total of 388 rooms. Additionally, a ground-level cafe will be situated at the southeast corner of the tower base.

Read More

Residential Development Proposed At 455 W Briar Place In Lake View East

Plans have been revealed for a new residential development at 453-455 W Briar Place in Lake View East. Located east of N Broadway and near Lincoln Park, the new structure will replace two existing multi-story homes built in the early 1900s that together make up a 9,180-square-foot lot. Locally-based GVP Development is leading the proposal along with design firm SGW Architecture who aims to mimic the style of its surroundings.

Read More

1400 S Wabash Avenue. Rendering by Pappageorge Haymes

South Loop’s 1400 S Wabash Avenue Claims 10th Spot On Countdown

Facade work continues on this year’s 10th tallest development at 1400 S Wabash Avenue in the South Loop. The mixed-use building has topped out and its facade continues to rise at the intersection with E 14th Street. The rear of the structure abuts up to the CTA Green Line tracks, continuing to create an urban canyon for the train tracks. Chicago-based CMK Companies, who also developed the nearby Imprint tower, is leading the project and Pappageorge Haymes is responsible for the design.

Read More

5235 N Western Avenue

5235 N Western Avenue Receives Construction Permits in Lincoln Square

Construction permits have been issued for a four-story mixed-use building at 5235 N Western Avenue in Lincoln Square. Planned by Panoptic Group, the new development will comprise of 18 total units atop ground-floor retail space, an elevator, and a 16-vehicle garage topped with a rooftop deck. Prior to development, the site was occupied by a one-floor masonry bank building.

Read More

Fetching more...