Construction Continues to Rapidly Progress for 1802 S State Street in South Loop
YIMBY stopped by the site of 1802 S State Street, a four-story residential building currently under construction in South Loop.
YIMBY stopped by the site of 1802 S State Street, a four-story residential building currently under construction in South Loop.
Construction is wrapping up at 1100 W Fulton Market in the rapidly developing Fulton Market neighborhood in West Loop. The mixed-use renovation and expansion features a five-story and three-story development. These two buildings will triple the existing square footage of an old meatpacking warehouse by integrating an additional floor on top of the existing two-story structure, as well as new ground-up construction on the adjacent second edifice.
YIMBY has the latest details and renderings for a four-story residential building at 3745 S Lake Park Avenue in the Oakland neighborhood. Construction permits were issued earlier this month, on the condition of passing field inspections.
YIMBY has photos of the site preparation for 1043 W Fulton Market in the development-heavy Fulton Market neighborhood. The development will be two-fold, consisting of a 12-story hotel with 132,000 square feet of space and a six-story boutique office building with an additional 46,000 square feet of space. The project will replace two single-story buildings and a parking lot.
Permits have been filed for a three-story building at 914 W Webster Avenue in Lincoln Park. The interior lot is located along W Webster Avenue between N Bissell Street and N Fremont Street. The nearest public transportation is the 37 CTA bus accessed at the Webster and Bissell stop at the end of the block. The Fullerton CTA L station, serviced by the Brown, Purple, and Red Lines, is a six-minute walk away. The site is also within a five-minute walk of N Halsted Street, W Armitage Avenue, and W Fullerton Parkway, three busy commercial and retail corridors. Webster 914 LLC is listed as the owner behind the applications, reporting the development cost as $250,000.