2145 S Halsted Street. Image by Lukas Kugler

Interior Work Continues on Mixed-Use Development at 2145 S Halsted Street in Pilsen

Interior work is underway on a four-story mixed-use development at 2145 S Halsted Street in Pilsen. The interior lot is located along S Halsted Street between W Cermak Road and W 21st Place. The nearest public transportation is the 21 CTA bus accessed at the Cermak and Halsted stop at the end of the block. Vision Group Investments LLC is in charge of the development.

Read More

2127 W Madison Street

Permits Issued for 2127 W Madison Street in United Center Park

Last week, YIMBY reported on a medium-sized mixed-use development at 2139 W Madison Street in Near West Side‘s United Center Park. Permits were also issued this month for an adjacent, similar-sized building by the same developer at 2127 W Madison Street. The development will be a five-story building, for which 2127 W Madison LLC is planning two retail spaces at ground level, with 40 units above. Parking, meanwhile, will include 40 on-site spaces for its residents. As there are no current lots with a 2127 address number, it is unclear if the building’s footprint will occupy the two adjacent 2125 and 2129 parcels.

Read More

Clarendale Six Corners

Construction Imminent on Mixed-Use Development at 4747 W Irving Park Road in Portage Park

Construction is imminent on a 10-story mixed-use development located at 4747 W Irving Park Road in Portage Park. Permits for the foundation of the structure and for the tower crane have been approved and issued. Located on a triangular parcel, the site is bound by W Irving Park Road, N Milwaukee Avenue, and N Kilpatrick Avenue. Ryan Companies is the developer and designer behind the project.

Read More


3213 S Union Avenue

Permits Issued for 3213 S Union Avenue in Bridgeport

Permits have been issued for a two-story residential building located at 3213 S Union Avenue in the Bridgeport neighborhood. The owner Zhuo Hua Xie Kuo has planned for two total units, as well as a basement underneath. Three on-grade parking spaces will be provided on a planned slab in the rear. The project will be replacing a 1.5-story masonry residential building with a detached garage.

Read More