Articles by Jack Crawford

751 N Hudson Avenue

Permits Issued for 751 N Hudson Avenue in River North

Permits have been issued for a nine-story mixed-use building at 751 N Hudson Avenue in River North. Planned by LG Development Group, the new construction which will yield ground-level retail space and 134 units on the above floors. Residents will have access to a fitness center, a second-floor pool deck with cabanas, fire pits, and an outdoor kitchen, as well as a top-floor amenity deck with unobstructed skyline views. Other features include a dog run, bike rooms, tenant storage, conference rooms, and co-working space with breakout rooms.

Read More

1045 on Fulton Market

Facade Work Begins at 1045 on Fulton Market in the Fulton Market District

The 12-story mixed-use development known as 1045 on Fulton Market hit a key milestone this past week when its first facade pieces were installed. At 150,000 square feet, the boutique Fulton Market building at 1045 W Fulton Market offers ground-level retail, with office floor plates above ranging in size from 14,000 to 10,000 square feet. Both buildings have been co-developed by Fulton Street Companies and Intercontinental Real Estate.

Read More


Bridgeview Bank Building

Adaptive Reuse Underway at Bridgeview Bank Building in Uptown

Both interior and exterior work is currently underway for the adaptive reuse of the 13-story Bridgeview Bank Building, located at 4753 N Broadway Avenue in Uptown. Previously known as the Sheridan Bank and Trust Building, the classically-styled structure was initially built at eight stories in 1925 before four additional floors were constructed in 1928. In 2007, the structure received landmark designation, before it was bought by Cedar St. Companies for $19 million in 2019.

Read More

7215 S Ridgeland Avenue

Renovation Permits Issued for 7215 S Ridgeland Avenue in South Shore

This week, renovation permits were issued to an existing two-story masonry building located at 7215 S Ridgeland Avenue in South Shore. The occupying owner Kim Russell plans to add a third unit to the basement portion, while also refurbishing the rest of the building. Other improvements include new drywall, new finishes and interior alterations, a replacement of the rear porch, and upgrades to the mechanical, electrical, and plumbing systems.

Read More

Fetching more...