Office

ALLY at 1229 W Concord

YIMBY Tours 1229 W Concord Place within Lincoln Yards Master Plan

This weekend, Chicago YIMBY had the opportunity to tour the nearly complete 1229 W Concord Place, the first building of the broader Lincoln Yards plan. Developed by Sterling Bay, the plan calls for a 53-acre urban revamp of a former North Branch industrial corridor. This first installation will offer 320,000 square feet of Class A medical research labs geared towards biotechnology and bioscience tenant companies.

Read More

Renderings Revealed For West Loop Tower At 415 N Sangamon Street

Renderings have been revealed for the upcoming mixed-use project at 415 N Sangamon Street in the West Loop. Shown to area locals during a public meeting held last night, plans for the tower have remained relatively the same with the images offering a first look at its solar panel-lined exterior. News on the proposal broke last September, replacing a vacant lot and incorporate the adjacent on-site building. Developer Fortem Voluntas Partners led by Jay Jordan, an ex-Sterling Bay leasing agent, is partnering with local firm Eckenhoff Saunders and Miller Hull on its design.

Read More

Details Revealed For West Loop Office Tower At 357 N Green Street

Details have been revealed for a new mixed-use development at 357 N Green Street in the West Loop. The final of the three-proposal being presented in this month’s Committee on Design meeting including the 600-foot-tall 420 N May Street, this tower will replace a vacant lot just north of the Metra tracks on the corner with W Kinzie Street. Proposed by Canadian-based Onni Group, this project is being designed by local architecture-firm SCB and will sit over the Kennedy Expressway below.

Read More


Redesign And Extension Approved For 130 N Franklin Street In The Loop

An extension has been granted and a redesign revealed for the mixed-use development at 130 N Franklin Street in The Loop. Located on the southwest corner with W Randolph Street, news of the proposal broke back in 2015 as a replacement of an existing empty lot along with a surface parking lot as well. Struggling to execute a tower on it, developer Tishman Speyer was granted an extension on their previous approval due to the last two years. The team at Tishman have been leading the efforts with local architecture firm Krueck Sexton Partners on all iterations of the design.

Read More

Fetching more...