Facade at Triangle Square Nears Completion in Bucktown
Facade work is progressing rapidly toward completion for Triangle Square, a major three-part development located along the North Branch Corridor in Bucktown.
Facade work is progressing rapidly toward completion for Triangle Square, a major three-part development located along the North Branch Corridor in Bucktown.
Exterior construction is now complete for the mixed-use 800 W Fulton Market in West Loop‘s Fulton Market district. At 300 feet in height, the 18-story edifice is one of West Loop’s tallest buildings. Bound by Fulton Market, N Green Street, W Wayman Street, and N Halsted street, the full-block project has replaced a series of low- and mid-rise masonry buildings.
Construction permits have been issued for a two-story office building located at 8204 W Belmont Avenue in Dunning. Owned by 8200 Belmont LLC, the development will include office space on both floors, as well as five outdoor parking spaces. The new construction is set to occupy a currently vacant plot of land. Given that this plot is divided into two separate parcels, it is unclear if the building will replace the full plot or just a portion.
Core work has fully topped out for the 52-story, 727-foot-tall office tower at 320 S Canal Street in West Loop Gate.
Steel construction has reached the fifth level for 609 W Randolph Street, a 15-story mixed-use building rising in West Loop Gate. Vista Property Group is the developer for the more than 100,000-square-foot project, which will house 1,770 square feet of retail on the first story and office space on the upper floors. The new structure will replace a former parking lot while integrating with a neighboring four-story masonry building that was built in the 1890s.