Lincoln Park

537 West Drummond Place construction progress

Trio Of Concrete Cores Rising At 537 West Drummond In Lincoln Park

Three concrete columns are rising at 537 West Drummond Place in Lincoln Park, as construction progress goes 3-D on a residential development from Moyer Properties. A new construction permit was issued by the City of Chicago to get work started on August 21, 2022, with general contractor Summit Design + Build finally able to break ground this past winter after starting site prep in the fall.

Read More

2222 North Southport Avenue construction permitted

Construction Permit Issued For Single-Family Lincoln Park Residence With Mismatched Demo Permit

A new construction permit was issued by the City of Chicago on April 7th to build a single-family home at 2222 North Southport Avenue in Lincoln Park. The entity of “2 x 4 N Southport LLC” is the recipient of the granted permission, allowing them to erect a two-story with basement home next to Clover Park. The application for the permit is dated April 4, an incredibly fast turnaround, and the reported cost is $910,000.

Read More


1942 North Orchard Street demolition

Five Units Permitted For Recently-Cleared Double Lot At 1942 North Orchard In Lincoln Park

Five residential units have been permitted to replace an 1890s home at 1942 North Orchard Street in Lincoln Park. The previous structure was torn down last fall, with the site marketed as a redevelopment opportunity. After demolition, the double lot sold in January for $4.2 million to Swan Property Development of Orland Park, who will now erect a four-story with basement building here.

Read More

Eight Townhomes Permitted On Former Cenacle Retreat Site In Lincoln Park

A permit has been issued to allow construction of eight townhomes at the former Cenacle Retreat & Conference Center on Fullerton Avenue in Lincoln Park. Addressed as 2329 North Cambridge Avenue, the homes will be built on Lot C, the third subdivision of the plot, located on the west side of the large site. The permit was issued April 2, a little more than five months after the application was filed in October of last year. It comes with a reported construction cost of $4.115 million.

Read More

Fetching more...