Demolition Complete For 424 South Wabash Hotel Tower In The Loop

Tribute Portfolio Hotel Chicago rendering by Pappageorge Haymes Partners

Demolition of the commercial building at 424 South Wabash Avenue in The Loop is complete, with the structure razed from the site and the old foundation dug away and smoothed over. That means site prep is the next step toward the upcoming Marriott Tribute Portfolio Hotel long planned for the site.

Heneghan Wrecking received a demolition permit for the building in February, with work getting underway in August. With general contractor ENC Construction & Development alongside, they also tore up the parking slabs from the lot next door and dug out that pesky foundation.

424 South Wabash Avenue demolition

Photo courtesy of ENC Construction & Development shows the old foundation, the last step in the demolition process

424 South Wabash Avenue demolition

Photo courtesy of ENC Construction & Development

424 South Wabash Avenue demolition

Photo courtesy of ENC Construction & Development

424 South Wabash Avenue demolition

Photo courtesy of ENC Construction & Development

Tribute Portfolio Hotel Chicago rendering by Pappageorge Haymes Partners

Tribute Portfolio Hotel Chicago rendering by Pappageorge Haymes Partners

A caisson permit was issued back on November 29, 2023 under a different hotel brand. It called for a 27-story tower with 280 guest rooms, ground-floor retail, and 60 parking spaces. But now it will be a 23-story, 340-room tower under the Marriott name. The latest renderings show a two-story podium for parking, the lobby, and retail/commercial space. Pappageorge Haymes Partners designed the building for co-developers DAC Development and Initium Development.

424 South Wabash Avenue demolition

September 3, from the Green Line. Slabs are gone, and most foundation work is complete. Photo by Daniel Schell

424 South Wabash demolition complete

Almost ready for site prep, 09/14/2025. Photo by Daniel Schell

424 South Wabash demolition complete

Photo by Daniel Schell

424 South Wabash demolition complete

Photo by Daniel Schell

424 South Wabash demolition complete

Photo by Daniel Schell

Two construction permits are pending for the hotel in the Chicago Data Portal. The older of the two, applied for on April 23, will allow for a reduction in building height due to the elimination of parking floors. The newer pending permit will allow for construction of the foundation and superstructure up to the underside of the fourth floor slab. An express permit issued March 24 named ENC Construction as the new general contractor. The full building permit is not yet pending.

424 South Wabash demolition complete

424 South Wabash Avenue is no more. Photo by Daniel Schell

424 South Wabash demolition complete

The construction site extends to the parking lot’s guard rail on the left. Photo by Daniel Schell

424 South Wabash demolition complete

From the L, pre-demolition. Photo by Daniel Schell

Construction is expected to begin in December, with an 18-month duration expected. That points to a projected opening date in early summer 2027.

Subscribe to YIMBY’s daily e-mail

Follow YIMBYgram for real-time photo updates
Like YIMBY on Facebook
Follow YIMBY’s Twitter for the latest in YIMBYnews

.

16 Comments on "Demolition Complete For 424 South Wabash Hotel Tower In The Loop"

  1. Question, in the first couple pictures it looks like the basement of the original building connected to a space under the sidewalk? Is that the case and if so, is that from the time they raised the streets and sidewalks? Just curious, thank you.

  2. That little building has/had beautiful Sullivanesque terra Cotta cornices. I hope they carefully salvaged those blocks. It’s sad to see such piece of art and long history goes to landfill.😿

  3. Glad to see this empty lots slowing filling in on South Wabash.

  4. What a thin building! Seems like the developers are going for lots of tiny hotel rooms with absolutely huge windows. Interested in seeing how it turns out

  5. Such a pretty little cornice. I hope it was salvaged

  6. There is an ongoing demand for hotel rooms near McCormick Palce as well as for businesses and family who need a mid priced property in the area.
    I’m kind of surprised that this is a George Papageorge project. They were all about postmodernism for a time.

    • Hopefully a architecture restoration company salvaged the whole upper trim and cornices. Would be such a sad loss of great detailed creativeness gone for good.

  7. This stretch of Wabash definitely needs some development and energy. I hope the property two parcels north of here gets moving again soon on the residential development proposed a few years ago.

Leave a Reply to brad Cancel reply

Your email address will not be published.


*