Progress At 566 West Van Buren Reaches Underside Of Sixth Level

566 West Van Buren August 2026 construction progress566 West Van Buren, 07/28/2026.

Construction progress has reached the sixth floor at 566 West Van Buren in the city’s West Loop neighborhood. That’s where Clark Construction and Adjustable Concrete Construction are erecting a 12-story, 199-unit apartment building for Riverside Investment & Development. The three concrete cores for stairways and elevators have risen about eight stories high.

566 West Van Buren August 2026 construction progress

Photo by Daniel Schell

566 West Van Buren August 2026 construction progress

Photo by Daniel Schell

566 West Van Buren August 2026 construction progress

Photo by Daniel Schell

566 West Van Buren August 2026 construction progress

Photo by Daniel Schell

566 West Van Buren August 2026 construction progress

Photo by Daniel Schell

566 West Van Buren August 2026 construction progress

Photo by Daniel Schell

566 West Van Buren August 2026 construction progress

Photo by Daniel Schell

The residential units form an L shape along Van Buren and South Jefferson Streets. Elevation rises no further than the first level on the northeast corner of the building, which abuts the rear alley and 321 South Jefferson next door. There are to be 42 indoor parking spaces, all located on the ground level. Antunovich Associates is the design architect.

566 West Van Buren August 2026 construction progress

Photo by Daniel Schell

566 West Van Buren August 2026 construction progress

Photo by Daniel Schell

566 West Van Buren August 2026 construction progress

Photo by Daniel Schell

566 West Van Buren August 2026 construction progress

Photo by Daniel Schell

566 West Van Buren August 2026 construction progress

Photo by Daniel Schell

566 West Van Buren August 2026 construction progress

Photo by Daniel Schell

566 West Van Buren August 2026 construction progress

Photo by Daniel Schell

566 West Van Buren August 2026 construction progress

Photo by Daniel Schell

566 West Van Buren August 2026 construction progress

Photo by Daniel Schell

566 West Van Buren August 2026 construction progress

Photo by Daniel Schell

566 West Van Buren August 2026 construction progress

Photo by Daniel Schell

Riverside filed an application to build here way back in July 2022; the foundation/superstructure permit didn’t come through until March 23 of this year, with the tower crane permitted 11 days prior. The full building was permitted on March 23. Permits for a construction hoist and a personnel hoist were issued in June. The project page on Riverside’s website targets an early 2027 delivery of dwelling units for new tenants.

566 West Van Buren August 2026 construction progress

Photo by Daniel Schell

Riverside filed an application to build here way back in July 2022; the foundation/superstructure permit didn’t come through until March 23 of this year, with the tower crane permitted 11 days prior. The full building was permitted on March 23. Permits for a construction hoist and a personnel hoist were issued in June. The project page on Riverside’s website targets an early 2027 delivery of dwelling units for new tenants.

566 West Van Buren August 2026 construction progress

Photo by Daniel Schell

566 West Van Buren August 2026 construction progress

Photo by Daniel Schell

566 West Van Buren August 2026 construction progress

Photo by Daniel Schell

Subscribe to YIMBY’s daily e-mail

Make YIMBY preferred on Google

Follow YIMBYgram for real-time photo updates
Like YIMBY on Facebook
Follow YIMBY’s Twitter for the latest in YIMBYnews

.

4 Comments on "Progress At 566 West Van Buren Reaches Underside Of Sixth Level"

  1. There are quite a few lots downtown we need to copy and paste this on. This is great infill.

  2. I’m basic, but I love this project. The area is a bit dead but if this specific area had more residential popping up organically, it could be a great bridge from the loop to wl

  3. Brock Wallace | August 5, 2026 at 6:00 pm | Reply

    Love to see this rise. Hopefully as more residential comes into fruition within the neighborhood, we’ll see some of the vacant retail spaces fill in along the Canal and Fulton street corridors.

  4. As someone who works across the street from this development, it’s been wild and cool to see how fast this project is moving ahead over the summer. This will add much needed housing and life over the former parking lot. And with the school (that includes a new medical college – I know because I work in that building) on the SW corner from here, this will be great for the neighborhood.

Leave a comment

Your email address will not be published.


*