A construction permit has been issued for a new residential development at 4228 S Langley Avenue in Bronzeville. The project entails a three-story, three-unit masonry building. The building’s design incorporates open rear steel decks, an egress stair, a concrete patio, and a three-vehicle private masonry garage. The project will occupy what was previously an empty lot, with ownership under Jack Properties LLC.
The architect responsible for the design is Charles E Schwartz. At this time, no visual renderings or detailed descriptions of the design are available.
The development will have nearby transit access, with bus service for Route 43 via a one-minute walk south, while bus service for Routes 4 and X4 are a four-minute walk southeast. The closest Green Line service is available at 43rd station via an 11-minute walk west.
The declared cost of construction amounts to $350,000, with Crown Construction Company as general contractor. At present, no official completion date has been established.
Subscribe to YIMBY’s daily e-mail
Follow YIMBYgram for real-time photo updates
Like YIMBY on Facebook
Follow YIMBY’s Twitter for the latest in YIMBYnews
Is that whole patch of grass from home on left to building on right the “lot” or just a standard city lot width?