A construction permit has been granted for a new multifamily residential development at 2042 W Irving Park Road in North Center. The proposed development will be a four-story masonry building featuring 20 dwelling units with a 10-car garage and 15 bike spaces. Base 3 Development is the developer behind the property, which has previously been occupied by a two-story residential structure and a garage.
Unit layouts will range from 513-square-foot studios to 1077-square-foot two-bedrooms. Each unit will have access to a private balcony or terrace space on the second level. Red Architects designed the red brick structure, which comes with multiple setbacks, limestone accents, and dark metal accents.
Closest bus service comprises stops for Route 50 and 80 within a two-minute walk east to the intersection of Damen, Irving Park, and Lincoln. Meanwhile, the CTA Brown Line is accessible at Irving Park station, a seven-minute walk east.
Base 3 General Contracting has been named as the general contractor overseeing the construction. As for the timeline, an estimated completion date for the $6,600,000 development has not been specified.
Subscribe to YIMBY’s daily e-mail
Follow YIMBYgram for real-time photo updates
Like YIMBY on Facebook
Follow YIMBY’s Twitter for the latest in YIMBYnews
Looks like a classic 6 flat. Except it’s 5 apartments to a floor instead of two. Huh.