Funding has been secured for the upcoming mixed-use development at 605 Davis Street in Evanston. Sitting near the intersection with Chicago Avenue, plans for the tower have been in the works for a few years before being approved by Evanston’s City Council back in April of this year. Efforts are being led by Vermilion Development.

Site map of 605 Davis Street via Google Maps
Vermilion has been working with local architecture firm SCB on its plans for the 29-story tower, having received a slight haircut from its previous iteration. When completed, it would cap out at 299 feet, surpassing the nearby Orrington Plaza as the city’s tallest building. It would also join nearby 900 Clark Street in redefining the skyline.

Rendering of 605 Davis Street by SCB
The ground floor of the structure will feature 2,900 square feet of commercial space, along with a small lobby and a ramp up to a 40-vehicle parking garage. The project has also agreed to lease 153 spaces in nearby garages. The upper levels will hold 419 residential units made up of studios, one-, two-, and three-bedroom layouts.

Updated rendering of 605 Davis Street by SCB
Of the total units, 20 percent will be considered affordable, with all residents having access to multiple amenity floors and terraces. The overall project will cost around $170 million to complete, with the development team having secured a loan for $113 million of that amount. Construction will ramp up soon ahead of a 2028 completion date.
Subscribe to YIMBY’s daily e-mail
![]()
Follow YIMBYgram for real-time photo updates
Like YIMBY on Facebook
Follow YIMBY’s Twitter for the latest in YIMBYnews


This tower brings nothing memorable to Evanston. Might as well be a lump in the Toronto skyline. Yes, density and housing is good even a tower would be fine, but it lacks any architecture, any character, any joy de vivre